Risk Mitigation in Construction

Explore top LinkedIn content from expert professionals.

  • View profile for Vitaly Friedman
    Vitaly Friedman Vitaly Friedman is an Influencer
    236,406 followers

    🚨 Designing For Stress and Emergency. Practical guidelines on how to design time-critical products to prevent errors and drive accuracy ↓ 🚫 People can’t multi-task, especially in very stressful situations. 🤔 Stress disrupts attention, memory, cognition, decision-making. 🤔 Also, it's difficult to prioritize and draw logical conclusions. ✅ In stress, we rely on fast, intuitive judgments — not reasoning. ✅ It leads to instinctive responses based on established habits. ✅ Goal: design flows that support focus and high accuracy. ✅ Start with better default settings, values, presets, actions. ✅ High-priority first: order of actions and buttons matters. ✅ Break complex tasks in a series of simple steps (10s each). ✅ Add built-in safeguards to prevent irreversible errors (Undo). ✅ Shift users to single-tasking: ask for one thing at a time. ✅ More simpler pages might work better than 1 complex page. ✅ Suggest a step-by-step plan of action to follow along. ✅ Design and test flows for emergency response ahead of time. 🚨 Add emergency mode for instant alerts, task assignments. In times of stress and high pressure, some people make decisions hastily, while others get entirely paralyzed. Either way is a likely path to mistakes — often irreversible ones, and often without time for extensive deliberations. Ideally, these decisions would be made way ahead of time — and reused when needed. The critical job that designers must do well is to help people focus. And that means removing distractions first — non-critical notifications and navigation. Asking simple questions and prompting simple actions — one thing at a time. Alert colleagues to get involved with a single button. Initiate an emergency mode with a pre-made chain of actions. Most importantly, set up an annual day to stress test your product and refine emergency responses. To check if fallbacks work as expected. If people know the protocols to follow. And if current UX of the product helps people manage failures and exceptional situations well enough. Emergencies will happen eventually — it’s just a matter of time. With good design, we can help mitigate risk and control damage, and make it hard to make irreversible mistakes. At its heart, that’s what good UX is exceptionally good at. Useful resources: Designing The SOS Emergency System, by Ritik Jayy https://lnkd.in/eT3KkVtK Designing For Crisis, by Eric Meyer https://lnkd.in/e3CwNuV9 Designing For Stressed Out Users (Series), by H Locke https://lnkd.in/ew_65Km4 Designing For Stress (Podcast), by Katie Swindler https://lnkd.in/e3jkPr8K Designing For Edge Cases and Exceptions https://lnkd.in/eeyrpp7m Design For Real Life, by Sara Wachter-Boettcher, Eric Meyer https://dfrlbook.com #ux #design

  • TWO DESIGN RULES TO SAVE YOUR PROJECT Trillions of dollars are pouring into clean energy, AI data centers, and new transport networks right now. Yet many of these megaprojects are heading straight for trouble. Why? Because owners and managers too often insist on building bespoke, custom monuments. When you build a one-off giant, time drags on. And time is a risk window. The longer delivery takes, the more bad stuff flies through that window to wreck your budget and timeline. If you want your big venture to succeed, stop over-engineering. Master these two simple design rules instead: 1. Replicable modularity. Build repeatable blocks, not customized monoliths. 2. Rapid iteration. Deliver fast. Learn fast. Repeat. To illustrate: • The Monolithic Way: Japan’s Monju nuclear reactor was custom-designed. It took 30 years and $12 billion to build. Result? It was outdated upon delivery and generated electricity for exactly one hour before shutting down forever. That is negative learning in action. • The Modular Way: The Madrid Metro extension skipped custom designs and unproven technology. They used standard stations and deployed identical tunneling modules. The outcome? 131 kilometers of metro built in eight years – at half the global average cost and twice the speed. When you build in modules – like Tesla’s Gigafactories, wind and solar farms, or satellite constellations – you create a powerful feedback loop. Module one teaches you how to build module two faster, cheaper, and safer, etc. Humans are terrible at long-range forecasting and one-off ventures. But we are brilliant at fast experimenting, learning, and repeating. Planning, researching, or leading a major venture? Stop building customized monuments. Build with Lego instead. Find the full argument, more examples, and data in Harvard Business Review, with free pdf here: https://lnkd.in/eTeWru_w Comments very welcome, kindly help share 🙏 (Photo credit: Creative Commons Attribution-Share Alike 4.0 International / Wikimedia Commons)

  • Why Detail Design Is Not Enough: The Critical Role of Shop Drawings In bridge projects there is a common misconception that all engineering work concludes once the detail design phase is completed. However detail design serves merely as a blueprint defining structural safety and overall geometry. You cannot build a bridge with design drawings alone. It is the shop drawing that bridges the gap between design and construction making actual fabrication possible. Consider a PSC box girder bridge with 40m spans. The detail design drawings will specify core parameters such as a deck thickness of 250mm D25 and D29 main reinforcement spaced at 150mm and 15.2mm 19 strand post tensioning tendons. Yet site workers cannot determine exact rebar cutting lengths or formwork assembly dimensions from these drawings alone. This is why specialized shop drawing engineers are absolutely essential. Their expertise is required for the following reasons. Clash Detection and Constructability In highly congested areas such as anchorage zones or cross section corners heavy reinforcement like D29 rebars and PT ducts intersect in three dimensions. Shop drawing engineers meticulously adjust placement coordinates at the millimeter level to prevent physical clashes and ensure proper concrete flow all while maintaining the intended structural capacity. Geometry Control Accounting for Stage Construction When constructing a bridge using methods like the Free Cantilever Method deformations occur due to dead load deflection concrete shrinkage and creep. Specialized engineers understand these stage by stage structural behaviors and calculate precise precamber values. Applying these adjustments to the fabrication geometry ensures the bridge achieves the exact intended longitudinal alignment upon completion. Integration with Temporary Works and Equipment Real world construction heavily relies on temporary equipment such as form travelers heavy lifting cranes and falsework. Determining construction joint locations segment pour volumes and connection details between permanent structures and temporary supports requires advanced engineering judgment far beyond simple drafting. Ultimately specialized shop drawing engineers are problem solvers who translate the designer intent into the builder language. A highly sophisticated design can only materialize into a safe and physical infrastructure through their rigorous engineering. #bridge #design #civil #construction #engineering #project #structure #management #shopdrawing

  • Most engineers still default to riprap. This pour replaces 70 cm of rock with 20. What you’re looking at is a fabric-formed concrete revetment — a double-layered woven geotextile pumped full of fine-aggregate concrete on site. The fabric is the formwork. Once cured, the geotextile becomes secondary; the concrete shell does the work. Under ASTM D18.25/D35.05 these are formally called GGFM (geotextile grout-filled mattresses) or FFCR. The pillow-like surface you see isn’t decorative — those are filter points that bleed pore-water pressure out of the embankment, which is what keeps the lining from blowing off the slope during drawdown. Why crews on canals, river banks, and bridge abutments are switching: → Thickness: typically 20–50 cm of concrete vs 60–80 cm of riprap for the same flow regime → Underwater install: no cofferdam, no dewatering — fabric is laid, then pumped → Conformity: the mattress drapes over irregular subgrade; no shaped formwork, no shotcrete crew → Material logic: fine-aggregate concrete pumps cleanly and resists abrasion better than gap-graded rock The trade-off most people miss: it’s a rigid lining once cured. Settlement, undermining at the toe, or a missed filter point will crack a panel the same way it cracks any concrete slab. Subgrade prep is the whole job. What’s your call — fabric-formed concrete or riprap when the bank is unstable and dewatering isn’t an option?

  • The video captures a critical situation at a recent construction site—a partially completed subterranean concrete structure, likely a water tank, that appears to be floating or experiencing severe uplift. This is a textbook example of what happens when the design and construction procedures do not adequately account for hydrostatic pressure in high-groundwater conditions, especially during or after heavy rainfall. The Failure Analysis: • Issue Identified: The structure is lifting because the upward pressure exerted by the water beneath the base slab (uplift force) is currently greater than the structure's downward weight. • Contributing Factors: 1. Insufficient Dead Load: The tank is incomplete. It lacks its final dead load (the weight of the full structure, backfill, and sometimes the designed water content) needed to counteract the hydrostatic pressure. 2. Water Flow Control Failure: The video confirms that dewatering and drainage efforts were likely inadequate. Water has flooded the excavation, and the surrounding soil is completely saturated. 3. Hydrostatic Force: The upward force (Fu) is calculated based on the area of the base slab (A) and the height of the groundwater table above the base (hw). When Fu exceeds the structure's weight (W), the structure floats. • The Immediate Danger: While the sheet piles and shoring are still in place, the soil and water movement is highly unpredictable. Uplift causes stresses and potential cracking in the green concrete, and the structural integrity is compromised, creating a major safety hazard and leading to costly, time-consuming repairs. Lessons learn: • Never Underestimate Dewatering: Effective dewatering must be continuously maintained until the structure achieves its permanent resisting weight. • Prioritize Anti-Uplift Measures: This includes installing temporary relief wells, anchor piles (if designed), or ballasting the structure with temporary internal water until it is backfilled. • Thorough Site Monitoring: Real-time monitoring of groundwater levels and structural movement is crucial in wet environments. #ConstructionSafety #CivilEngineering #HydrostaticUplift #StructuralEngineering #SiteManagement

  • If You Never Considered This... You Should Now Protecting People Using Exclusion Zone Lighting In my 20+ years in Occupational Health and Safety, I’ve conducted countless risk assessments, led site safety briefings, investigated incidents, and sat through many safety budget meetings. But not once in those discussions did I hear about Exclusion Zone Lighting. Maybe this solution wasn’t available back then. Maybe it wasn’t visible to us. But now that I’ve seen it, I can’t ignore it. And I believe we, as HSE professionals, should not ignore it either. If you’re working in the civil construction industry or around heavy machinery, you already know how much we rely on flagmen or banksmen to guide vehicle movement and keep operations flowing. But have we ever really asked: → What protects the flagman? → What safeguards the person standing closest to danger? I’ve come across incident reports where spotters were seriously injured or worse due to blind spots, sudden machine movements, or simply being too close. This is where Exclusion Zone Lighting becomes a meaningful innovation. It’s not just lights. It’s a visual warning system that projects clear, high-visibility safety zones instantly telling workers and pedestrians where it’s safe to stand… and where it’s not. Benefits like: → Extra reaction time for people on the ground → Reduced blind spot incidents for equipment operators → Safer working environments especially in low visibility or high-traffic areas This isn’t limited to one machine or one site. It’s applicable across: → Forklifts → Dumpers → Rollers → Cranes → Pavers → Lorries → Vans And sites like: → Construction zones → Waste plants → Quarries → Roadwork sites → Logistics yards Let’s be honest : cones, signs, and reflective jackets served their time. But safety isn’t about tradition.  It’s about protection. So here’s my message to fellow safety professionals and project decision-makers: Start bringing innovations like this into your conversations. Introduce it during your next risk assessment. Add it into your next safety budget discussion. At the very least, start talking about it. I’m committed to including this in my future projects and recommendations. Because safety must evolve. We can’t keep doing safety the way we’ve always done it. We must lead the way by embracing smart, proactive solutions that actually save lives. If you want to learn more about this solution,  Visit the link in the comment below or connect with Carl Evans.

  • NATO is developing a crucial backup plan for the global internet in case undersea cables are damaged or sabotaged. The initiative, called HEIST (hybrid space-submarine architecture ensuring infosec of telecommunications), comes after recent incidents highlighted the vulnerability of submarine fiber-optic networks that carry 95% of intercontinental internet traffic. Testing begins in 2025 at Sweden's Blekinge Institute of Technology. The project aims to quickly detect cable damage and reroute data through satellites. While #satellites can't match fiber-optic cables' capacity (340 terabits/second vs 5 gigabits/second), new laser communication technology could boost satellite bandwidth by 40x. This initiative addresses both accidental damage (100 cable cuts annually) and potential deliberate sabotage. The need became apparent after recent incidents, including cable damage in the Red Sea and Baltic Sea disruptions. With undersea cables handling over $10 trillion in daily financial transactions, establishing reliable backup systems is vital for global communication security. #security #space

  • I’m 42. Here’s what I wish I knew about construction contracts at 25. I’ve spent years untangling disputes, fixing costly contract errors, and learning the hard way that ignoring the details of your contract can sink a project. If I could go back, here’s what I’d tell my younger self—and every construction professional starting out: 1. Those Who Master JBCC Hold the Power When I first started, I thought contracts were just legal fluff. Huge mistake. The JBCC is not just paperwork—it’s a strategic weapon. It tells you exactly who owns the risk, how to manage it, and where the pitfalls are. Once I understood that, I stopped playing defense and started anticipating and controlling risks before they controlled me. Know it. Master it. Use it. 2. It’s Not About Trust I hear this all the time: "Why can’t we just shake hands like in the good ol’ days?" Because contracts aren’t about trust. They’re about risk. If the person you trust gets hit by a bus, moves on, or gets fired—where does that leave you? I’ve seen this play out too many times. A Contractor and a Principal Agent have a great relationship, everything runs smoothly—until the PA is gone. Suddenly, the Contractor is exposed to massive risk because their “trust” wasn’t backed by a contract. Contracts don’t care about trust or our feelings about each other. Contracts protect your interests—no matter the trust or who is involved. 3. Manage Your Risk AND Be the Nice Guy Too many Contractors believe that submitting claims makes them a "bad" or "claims-hungry" Contractor. Biggest myth in the industry. I’ve seen great companies go under because they avoided enforcing their rights—just to keep everyone happy. Here’s the truth: ✅ You can be a fair, collaborative, and helpful Contractor. ✅ You can still protect your interests by following the contract’s provisions. One doesn’t cancel out the other. It’s not about being aggressive—it’s about being professional. The days of Contractors just putting blind trust in others are over. It’s 2025. Your business is your priority—protect it. Master your contract. Manage your risk. Stay in business. Enjoy this? ♻️ Repost it to your network and share your insights. Join 2,563+ subscribers getting monthly guides and blueprints for construction success: https://zurl.co/jIYSM

  • New rule for government contractors: If you’re going to lie about your cybersecurity, at least don’t do it in writing. Because the DOJ just reminded us that spreadsheets with self-assessed scores are exhibit A in a False Claims Act case. Here’s what went down: March 2025 – A Massachusetts contractor (MORSE) proudly submitted a Supplier Performance Risk System (SPRS) score of 104 out of 110. The only problem? An independent audit said it was closer to –142. Yes, negative. One. Forty. Two. Result: $4.6 million settlement. For getting creative with cybersecurity math. May 2025 – A Raytheon subsidiary (now “Nightwing,” because apparently “Ghost Protocol” was taken) shelled out $8.4 million for failing to implement NIST 800‑171 on nearly 30 DoD contracts. Their compliance plan may have existed, in spirit, but not in practice. What this means (aka, What your GC wishes you’d read before hitting “submit”): - “Self-attested” doesn’t mean “make it up.” - That SPRS score? It’s not just between you and Procurement anymore. - The DOJ isn’t waiting for CMMC 2.0, they’re already enforcing cybersecurity misrepresentations under the False Claims Act. Friendly reminder: If your NIST 800-171 compliance plan is still “under review,” maybe don’t claim it’s fully implemented. The government now does fact-checks…with subpoenas. No emoji, just the reality: Cybersecurity isn’t just an IT issue. It’s a contractual one. And if you overpromise and underdeliver, you may find yourself paying for both the breach and the bluff.

  • 15 Years -15 Don’ts After 15 years in EPC, I’ve seen things you wouldn’t believe. Some mistakes were painful, some almost funny, but all of them left a mark. Here are my top 15 Don’ts that can derail any project: 1. Starting without a proper RAM test or geotechnical survey, saving money upfront, paying much more later. 2. Ignoring safety, workers in flip-flops, even children or babies on site. Unbelievable, but I’ve seen it. 3. Choosing low-quality components, cheap at the beginning, expensive forever. 4. Leaving responsibilities unclear, when nobody decides, chaos decides. 5. Hiding problems, small issues turn into big ones if you don’t address them early. 6. Awarding subcontractors only on lowest price, change orders are then guaranteed. 7. Bad site logistics, the first truck arrives and nobody knows where to unload. 8. Skipping the golden table, endless disputes later about “what’s correct.” 9. Wrong cables, when the inverter terminals are too small, just splice a thinner cable underground (yes, I’ve seen it). 10. Leaving unfinished work with the comment: “That’s for the O&M team to handle.”! Construction is never complete if responsibility is pushed downstream. 11. Believing more manpower fixes delays, usually it makes them worse. 12. Unrealistic timelines, ignoring permits, supply chain, or weather. 13. Starting in autumn and expecting the same timeline as in spring, winter changes everything. 14. Assuming winter construction costs the same as summer, it never does. 15. Treating commissioning as “just paperwork”, instead of a critical system test. Your turn: Which Don’ts have you seen in your projects? Who can top this list? #AndreasBach #SolarEnergy #Renewables #EPC #BESS #ProjectManagement #ConstructionFails

Explore categories